USL is pleased to be part of the revitalisation programme at Grade II* listed St Mary-at-Finchley. The church sits at the heart of the Finchley Church End Conservation Area. The programme aims to make the most of the site and to improve physical, cultural and digital access for the local community.
St Mary-at-Finchley is the oldest building in Finchley. Some believe the site was sacred in Saxon times, and a church was certainly standing by the 13th century, when it was known as “The Church of Our Ladye at Fynchesley”. The nave and its roof mostly date from the 15th century. The chancel was destroyed by bombing in the Second World War and later sympathetically restored.
To address ongoing leaks, USL carried out a full roofing and repair scheme in partnership with Edwards Wilson Architects. The project has been generously supported by grants from The National Lottery Heritage Fund, the London Borough of Barnet, the National Churches Trust, the Wolfson Fabric Repair Fund, Garfield Weston and the CSDS Foundation.
Works Undertaken:
- Roof void inspections: Full inspections with the architect and structural engineer, supported by a photographic survey and moisture readings throughout the roof structure.
- Careful strip-out: Existing slates, battens and flashings removed with slate sizes and gauges recorded, to replicate the original coursing. Slates assessed for salvage and re-use.
- Slate re-covering: New Westmorland slates to the nave, north aisle and south aisle. Full reclaimed slates from the existing roofs to the chancel and chapel.
- Zinc roofing: VM Zinc standing seam roofing to the outer south aisle, replacing the existing covering as an alternative to lead.
- Insulation: Natural insulation to the roof voids, with a warm roof build-up to selected areas.
- Timber repairs: Sarking boards retained for re-use where possible and repaired or replaced where needed. Localised timber repairs, including to an area of dry rot at the east end of the north aisle.
- Leadwork and zinc gutters: New lead soakers and flashings throughout, with new zinc valley and box gutters installed to industry guidance.
- Rainwater goods: New Alumasc heritage-range gutters and downpipes, with new timber fascias. Retained rainwater goods redecorated.
- Stonework and masonry: Mortar analysis and samples to match the existing pointing. New coping stones and indent repairs in matching stone, with lime repointing and gentle removal of moss and vegetation.
- Vestry and clerestory: Localised repairs to the vestry roof and weathering details to the clerestory gutters, protecting the fragile windows.
- Working in a live church: Scaffolding and hoarding with public safety measures, fire escape routes kept clear and protection of the churchyard tombs. The church remains in use throughout.
Read more